jQuery pagination
No Boiler Parameters Purpose Discription Customer End user Status
Services for "configuration to commissioning" of fired boilers.
1 80 TPH, 45 kg/cm2, 450 degc Bagasse fired Co‐generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported wet scrubber NHEC, Pune MGSSK, Karnataka Commissioned
2 70 TPH, 45 kg/cm2, 450 degc Bagasse fired Co‐generation DG , spce tube furnace, rad +conv super htr, bi drum, bottom supported wet scrubber NHEC, Pune NHEC, Pune Gurudatta SSK Maharashtra Commissioned
3 12 TPH, 32 kg/cm2, 380 deg c Bagasse fired Process DG , membrane furnace, rad +conv super htr, bi drum, bottom supported, multi cyclone NHEC, Pune Alard Industries Gujarath plant Enginnering completed.
4 80 TPH, 67 kg/cm2, 500 degc Bagasse fired Co‐generation TG , membrane furnace, radiant super htr, bi drum, bottom supported, ESP NHEC, Pune Bhagauli Sugar UP Commissioned
5 120 TPH, 35 kg/cm2, 400 degc Bagasse Bagasse fired fired Co‐generation DG , membrane furnace, rad +conv susuper per htr htr,, bi bi drum drum,, bottom bottom supported supported ESP CBL, Chandigarha Dhampur Sugars UP Commissioned
6 80 TPH, 67 kg/cm2, 500 degc Bagasse and coal fired Co‐generation TG , membrane furnace, radiant super htr, bi drum, bottom supported, ESP NHEC, Pune Lasuco‐Vietnam Under progress
7 40 TPH, 35 kg/cm2, 380 degc NG fired Process Bottom fired burner , membrane furnace, rad+conv super htr, bi drum, bottom supported, NHEC, Pune Desh Bandhav Bangladesh Commissioned
8 80 TPH, 45 kg/cm2, 450 degc NG fired Process Front wall fired burners, membrane furnace, rad radiant super htr, single drum, bottom supported,NHEC, Pune NHEC, Pune DSMC Bangladesh Enginnering completed.
9 70 TPH, 45 kg/cm2, 450 degc Bagasse fired Co‐generation DG , spce tube furnace, rad +conv super htr, bi drum, bottom supported, NHEC, Pune **** Kenya Commissioned
10 0 60 TPH, 45 kg/cm2, 430 degc cotton stalk + coal fired Power Plant TG , membrane furnace, conv super htr bi drum, top supported, ESP CBL, Chandigarha Gaps Power Maharashtra Commissioned
11 13 TPH, 45 kg/cm2, 430 degc Coal + rice husk fired Co‐generation FBC , membrane furnace, conv super htr bi drum, bottom supported, bag filter HITECH, Maharashtra Pentokey Chemicals Maharashtra Commissioned
12 12 TPH, 45 kg/cm2, 430 degc Coal + bagasse fired Co‐generation FBC , membrane furnace, conv super htr bi drum, bottom supported, bag filter HITECH, Maharashtra ****** Maharashtra Under progress
13 35 TPH, 45 kg/cm2, 450 degc cotton stalk + coal fired Co‐generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported ESP HITECH Maharashtra Anuraj Sugars Maharashtra Under Commissioning
14 40 TPH, 45 kg/cm2, 450 degc Bagasse fired Co‐generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported Multicyclone HITECH, Maharashtra Venkatesh Krupa Maharashtra Under progress
15 5 10 TPH, 45 kg/cm2, 430 degc Bagasse fired Co‐generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported Multi cyclone HITECH,  Maharashtra ****** Maharashtra Under progress
16 50 TPH, 45 kg/cm2, 430 degc Palm waste‐EFB, fibers, nuts Power Plant STG , membrane furnace, conv super htr bi drum, top supported. Mechmar Malysia Natural Electricty Thailand Under progress
17 45 TPH, 45 kg/cm2, 450 degc 22 nono‐ coal fired Power Plant TG , membrane furnace, conv super htr bi drum, top supported, MDC Mechmar Malysia Vapour Honduras Commissioned
18 Hot water generator on DG exhaust gas Power Plant Vertical tube, internaly lined, modular Maxheat TVS Tamilnadu Commissioned
19 50 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported Multicyclone HITECH,Maharashtra Uganda Commissioned
20 55 TPH, 45 kg/cm2, 430 degc Palm waste-EFB, Power Plant STG , membrane furnace, conv super htr single drum, tail end type. Mechmar Malysia Felda Malaysia Under Commissioning
21 140 TPH, 72 kg/cm2, 520 degc Bagasse fired Co-generation Dumping G , membrane furnace, rad +conv super htr, single drum, bottom supported Meru Industries Maharashtra Gangamai Paithan, India Commissioned
22 100 TPH, 87 kg/cm2, 520 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, single drum, bottom supported Cheema Industries Maharashtra Shirguppa Karnataka Commissioned
23 40 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation DG , membrane furnace, rad +conv super htr, bi drum, bottom supported HITECH, Maharashtra Mayuge Sugar Uganda Commissioned
24 55 TPH, 45 kg/cm2, 430 degc Palm waste-EFB, Power Plant STG , membrane furnace, conv super htr single drum, tail end type. Mechmar Malysia Tha Chang Thailand Commissioned
25 60 TPH, 45 kg/cm2, 430 degc Palm waste-EFB, Power Plant STG , membrane furnace, conv super htr single drum, tail end type. Hitech India Shraff power Thailand Under Commissioned
26 22 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Loknete SSK Commissioned
27 50 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Kamuli Sugar Uganda Under progress
28 20 TPH, 67 kg/cm2, 500 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, single drum, bottom supported Hitech India Fab tech, India Under progress
29 60 TPH, 67 kg/cm2, 500 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, b drum, bottom supported NHEC India Pellawata Sugar Srilanka Under progress
30 90 TPH, 67 kg/cm2, 500 degc Bagasse fired Co-generation Travelling Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported NHEC India Srilanka Under progress
31 15 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation Dumping Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Sai engg and equip India Zanzibar sugar Zanzibar Under progress
32 12 TPH, 32 kg/cm2, 380 degc Bagasse fired Co-generation Dumping Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Sai engg and equip India Under progress
33 40 TPH, 45 kg/cm2, 450 degc Bagasse fired Co-generation Traveling Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Bangladesh Under progress
34 40 TPH, 45 kg/cm2, 490 degc Rice husk fired Co-generation FBC , membrane furnace, rad +conv super htr, bi drum, top supported Saviour boilers India Ambika Rice mill Haryana Under progress
No Boiler Parameters Purpose Discription Customer End user Status
Services For Trouble Shooting Of Boilers.
1 65 TPH * 45 kg/cm2, 450 degc coal, julia flora, wood fired Power plant Frequent failure of travelling grate Primary air system modified. Sound cast Maharashtra Clarion Power AP Commissioned
2 55 TPH *45 kg/cm2, 430 degc mustered husk ,coal Power plant Frequent failures of travelling grate Pressure parts and combustion system modified Sound cast Maharashtra Amrut Power Rajasthan Commissioned
3 45 TPH *45 kg/cm2, 450 deg coal fired Co-generation Frequent failures of travelling grate grate mounting and air system modified CBL, Chandigarha Star Paper UP Commissioned
4 25 TPH, 45 kg/cm2, 450 deg c Power Under performance and grate failures Sper heater, Aph modifed, grate mounting and firing system modified Stoicho combustion Technology Alkali Amines Maharashtra Commissioned
5 40 TPH, 45 kg/cm2, 450 deg c Co-generation Frequent failures of furnace tubes and risers circulation circuit modified. HITECH Maharashtra Bhavani Sugars Maharashtra Commissioned
6 45 tph, 45 kg/cm2, 450 deg c Co-generation Under performance of boiler bwas improved to required capacity Perry Sugar, Ramdurg Karnataka Perry Sugar, Ramdurg Karnataka Commissioned
7 60 tph, 67 kg/cm2, 500 deg c Co-generation Under performance of boiler bwas improved to required capacity APT power Hydrabad Bhavnagar Power Bhavnagar Commissioned
No Boiler Parameters Purpose Discription Customer End user Status
Services For Trouble Shooting Of Boilers.
1 Services For Capacity Enhancement Of Boilers. Co-generation Capacity enhancement modification in sup htr, eco, aph and fans JPMA Sony Sugars Kenya Commissioned
2 35 tph- 45 450 deg c Co-generation Capacity enhancement modification in Eco, Aph, Fans JPMA Kakira Sugars Uganda Commissioned
3 35 tph to 40 tph * 35 kg/cm2 400 deg c, bagasse fired Co-generation Capacity enhancement furnace, super htr, secondary air system, modified HITECH Gandhavi Gujarath Commissioned
4 40 tph- 32 kg/cm2 420 deg c Power Capacity enhancement super heater, eco, aph, fans modified HITECH Yogeswari, Maharashtra Under progress
5 70 tph- 45 kg/cm2 450 deg c Co-generation Frequent failures of furnace tubes and risers circulation circuit modified. NHEC West Kenya, Sugars Kenya Under progress
6 45 tph, 45 kg/cm2, 450 deg c Co-generation Under performance of boiler bwas improved to required capacity Perry Sugar, Ramdurg Karnataka Perry Sugar, Ramdurg Karnataka Commissioned
7 50 tph- 45 kg/cm2 500 degc Co-generation Dumping Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Sanjivani sugar Maharashtra Under progress
8 40 tph- 45 kg/cm2 450 degc bagasse fired Co-generation Dumping Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Mahua Sugar Gujarath Under progress
9 45 tph- 45 kg/cm2 490 degc Co-generation Dumping Grate , membrane furnace, rad +conv super htr, bi drum, bottom supported Hitech India Venkatesh krupa Gujarath Under progress
No Boiler Parameters Purpose Discription Customer End user Status
Engineering Services For Boilers.
1 33 mw power plant- 17 tph 45 bar saturated Power plat design engineering for wood gasifier gas cooler boiler ME engineering UK Arbare Power UK Engineering completed
2 5MW gas turbine Designing of steel str, casing of WHRU ME engineering UK Solar Power UK Completed
3 20 tph- * 4 no boilers Piping stress analysis of interconnecting 4 boilers with pitching of barge. ME engineering UK Completed
4 40tph coal fired boiler Weight reduction exercise for various models of bidrum boilers Mechmar Malaysia NA Completed
5 12 MW Power plant Piping stress analysis and engineering for boiler and main power plant piping WIL Maharashtra Clarion Andhrapradesh Complted
6 20 MW power plant Piping stress analysis and engineering for boiler and main power plant piping WIL Maharashtra Doodhganga Karnataka Completed
7 Seting up complete boiler house 17 TPH 21 kg/cm2 saturated Lignite fired Process Sizing, selection, plant engineering of all boiler accessories and boiler. FBC, bi drum, MDC Aquagel- Uniliver Gujarath Desh Bandhav Bangladesh Completed
8 Seting up complete boiler house 10 TPH 17.5 kg/cm2 saturated Lignite fired Process Sizing, selection, plant engineering of all boiler accessories and boiler. FBC, combi, MDC Madhu Silica Gujarath DSMC Bangladesh Completed
9 Seting up complete boiler house 10 TPH 10.5 kg/cm2 hot water Oil Fired Process Sizing, selection, plant engineering of all boiler accessories and boiler. for heating of floriculture shed KFL floriculturist Maharashtra Completed
10 2 MW Power plant 2 no sponge iron waste heat recovery Power Piping stress analysis and engineering for boiler and main power plant piping Thermax Maharashtra Ganesh Spong iron Orisa Engineering completed
11 DPR for 12 MW co-gen power plant in sugar industry Co‐generation Detail design of plant cycle, preperation of all specifications, costing of plant, 10 year cash flow statement completed
12 DPR for 4 MW power plant for sponge iron plant Power Detail design of plant cycle, preperation of all specifications, costing of plant, 10 year cash flow statement Hospet Steel Karnataka completed
13 DPR for WHRU on various DG exhaust Process Detail designs of models, major purchase specifications, costing, BE analysis 10 year cash flow statement MITCON Maharashtra completed
14 4 MW power plant Power Piping stress analysis and engineering for main power plant piping MITCON Maharashtra Gherda Chemicals Maharashtra Completed
15 2000 , 3000 kg/hr spreader 3000, 5000, 7500, 10000 kg/hr 2000 , 3000 kg/hr spreader 3000, 5000, 7500, 10000 kg/hr Coal biomass Coal biomass Product developed for mechanical rotary spreder for boiler pnumatic spreaders slat conveors for fuel feeding extractor and screw conveyors for feeding Stoichio Combustion Technology